Part 1:Unboxing Inspection & Initial Preparation
This section introduces inspection items after unboxing the product and the list of required spare parts.
Parts verification: After receiving the package, check that all parts are included. Please note that part #F is inserted into the column. Please remove part #F first.


Part 2: Core Component Assembly
2.1 Preliminary Assembly of Part D and Part F
Alignment requirement: Align Part D with Part F, making sure the holes and orientation are correct.

2.2 Integration and Fastening of Multiple Parts
Target connecting parts: Attach Part D and Part F to Part A, Part L, and Part H.
Fastening method: Securing with screw#1.


Part 3: Panel Installation & Ground Positioning
3.1 Pole connection with Part C
Installation operation: Attach the assembled pole parts to Part C.
Direction reminder: Make sure the raised edge of the panel faces downward.

3.2 Ground Positioning & Preliminary Fixing
Unit erection: Stand the unit upright.
Position selection: Position it in the desired location.
Preliminary soil embedding: Press it into the soil.

3.3 Important Installation Reminders
Ground condition: Ensure the ground is level.
Phased operation: Do not fully insert the post at this stage, as uneven ground may affect the installation result.

Part 4: Full Installation of Part C Panels
4.1 Install all Part C panels.
4.2 Critical Reminder for Direction Consistency
Front and back distinction: Part C panels have a front and backside.
Unified direction requirement: Ensure the raised edge faces downward and all panels are installed in the same direction for a clean appearance.


Part 5: Deep Fixing of Ground Stakes
5.1 Tool Preparation: Wooden block and Hammer
5.2 Standard Hammering Operation
Use the wooden block to protect the post while hammering, gradually drive the ground stake into the soil.
5.3 Auxiliary Adjustment Tips
If needed, dig the soil slightly to bury the base plate, Ensure the post remains straight.


Part 6: Final Component Installation & Completion
6.1 Part U Insertion Column


6.2 Part B Installation, secure it with screw#1.


6.3 Part E Installation, secure it with screw#7.

6.4 Installation Completion
Installation complete. Enjoy a clean and organized outdoor space.